Three ways in

Stated openly

GHS

What it costs

Nobody can price a building from a web page. What we can publish is how we charge, so you know what you are agreeing to before the first meeting.

Ask for a number

Pre-construction advisory

GHS 18,000

fixed fee

Before you commit to anything: a site appraisal, an order-of-cost estimate and a programme you can take to a lender.

Site walk and constraints report

Order-of-cost estimate, elemental

Outline programme and permit path

Two rounds of revision

Ask about this

Project management

4.5%

of construction cost

We hold the programme, the budget and the subcontractors on your behalf, and report to you monthly in plain language.

Tender packaging and evaluation

Programme and cost control throughout

Monthly two-page board report

Handover, O&M and defects management

Talk it through

Design & build

By tender

measured quantities

One contract from concept to keys. Priced on measured quantities with preliminaries shown separately, never as a percentage on a guess.

Single point of responsibility

Fixed price on an agreed scope

Weekly valuation and quality record

Twelve-month defects liability

Ask about this

Every figure above is exclusive of VAT and NHIL. Advisory fees are credited in full against a construction contract awarded within six months.

What moves a price

What is under the plot

Rock, a high water table or eleven metres of level change can put a fifth on the substructure before anything shows above ground.

How the site is reached

A plot a laden truck cannot enter needs double handling, and double handling is a line in the preliminaries every single week.

The specification

Imported curtain walling against local aluminium is the difference between two budgets, not two finishes. We will price both.

The programme

A date pulled forward is bought with night shifts and extra plant. It is available, and it is never free.

What a tender return holds

Compare ours against anyone's line by line. If a competitor's return is missing three of these, the difference in the bottom line is not a saving.

Priced bill of quantities

Preliminaries, itemised

Programme with critical path

Method statement per package

Named subcontractors

Cash-flow forecast

Insurance certificates

Health and safety plan

A site engineer carrying a rolled set of drawings

Trusted by clients

Their site team kept the programme moving without ever hiding a problem from us. Every milestone landed when they said it would, and the finish is better than the drawings promised.

Michael Anaman

Commercial property developer, Accra

More voices
A concrete structure standing against the night sky

Let's discuss what's next

Great buildings are not defined by their size, but by how well they serve the people who end up using them every day.

Start your project Explore projects
Tower cranes standing over a rising block at dusk

Project intake // 2026

Let's build what lasts

Start your project