Careers

We would rather train you than hire you twice.

A hundred and eighty people on the books, most of them here more than five years. Four of our five site foremen started on the tools.

Send us a CV

The people

The crews who actually build it.

Foremen, steel fixers, carpenters, masons and plant operators — most of them on the books rather than on a day rate.

A site crew in yellow helmets at a briefing

180

People on the books

1 : 9

Foreman to crew

0

Lost-time injuries, 2025

Open roles

Six vacancies, all of them permanent.

We hire onto the payroll rather than by the day. It costs more per week and it is the reason the finishes are consistent.

Site foreman — structures

Accra · Permanent

Running a reinforced-concrete frame from setting out to roof, with a crew of nine and a weekly look-ahead you own.

Quantity surveyor

Accra — head office · Permanent

Valuations, variations and subcontract accounts across three live sites. You will be measuring, not just checking somebody else's measure.

Bench joiner

Tema · Permanent

Casework and second fix out of the Tema shop, with machine time and a hand-tool bench that is actually kept sharp.

Health & safety officer

Greater Accra · Permanent

Owning the safety file across five sites, running the toolbox talks and the monthly audit, and stopping work when it needs stopping.

Plant operator — excavator

Accra / Kumasi · Permanent

360 excavator and telehandler across the Accra and Kumasi yards. Ticket required; we will fund the next one.

Graduate site engineer

Accra · Two-year programme

Two years rotating through setting out, temporary works, QA and procurement, with a named engineer signing off each rotation.

cv@mason.com

Speculative applications

Within 5 days

We answer every application

What you get

The things that cost us money.

On the books from day one

SSNIT and PAYE from the first week, not after a probation that keeps being extended.

Boots, helmet and hi-vis provided

Replaced when they wear out rather than when the audit is due, and you keep them if you leave.

Tickets and training funded

Plant tickets, scaffolding, first aid and NVQ equivalents paid for, with the time off to sit them.

Medical cover for you and two dependants

Private cover at a named facility in Accra, Tema or Kumasi depending on where you are based.

Site transport from three pick-up points

Because a crew that arrives at seven having spent two hours in a tro-tro is not a crew that lays block well.

A route from crew to foreman

Four of our five current site foremen started here as steel fixers or masons. It is the normal path, not the exception.

Testimonials

Built right. Backed by our clients.

KM

Kwabena Mensah

Head of operations, Pelican Foods

They handed over our 4,200 m² cold store three weeks before the date in the contract, and the snag list was eleven items long. Nobody on our side has worked with a contractor like that before.

5.0

NA

Naa Adjeley Asare

Facilities director, Ridge Hospital Trust

Building next to a working out-patient department is a scheduling problem before it is a construction one. They planned around our clinics rather than asking us to plan around them.

5.0

YB

Yaw Boateng

Managing partner, Sankofa Estates

Three blocks, one programme, one set of valuations that always arrived on the Friday. The finish quality is the reason we have given them the next phase without going back out to tender.

5.0

A city construction site at dusk

Ready to build?

On-time, code-compliant construction starts here.

Priced estimate inside five working days · Licensed & insured · Ten-year structural warranty

Get an estimate See our pricing

5 working days

To a priced estimate

10 years

Structural warranty

4.9 / 5.0

168 Google reviews