Our projects

Buildings that are still doing their job.

Eight hundred and forty-seven completions since 1994. These five are the ones clients ask us about most, and the ones we are happiest to be judged on.

Start a project

Our projects

What we've built

A modern clinical block behind mature trees

Healthcare

Ridge Medical Annex

Accra · 9,400 m²

A commercial tower in the last stages of construction

Commercial

Airport City Tower

Accra · 18,600 m²

Concrete piers carrying a new road interchange

Infrastructure

Tema Motorway Interchange

Tema · 1.8 km

A glazed office building on a landscaped plot

Offices

Cantonments Office Park

Accra · 12,100 m²

A concrete teaching block with deep window reveals

Education

Legon Science Block

Accra · 6,800 m²

The finished entrance hall of a completed office building

Cantonments Office Park

Location

Accra

Size

12,100 m²

Duration

24 months

Case studies

Five jobs, and what was hard about each.

Every one of these was built while somebody else was still using the site, the road or the building next door.

Ridge Medical Annex

Healthcare · Accra

A four-storey out-patient annex built alongside a working hospital, with the theatre wing handed over eleven weeks early.

9,400 m²

Size

22 months

Programme

Airport City Tower

Commercial · Accra

Fourteen floors of shell-and-core office over three basement levels, delivered with the tenant fit-out running two floors behind the frame.

18,600 m²

Size

30 months

Programme

Tema Motorway Interchange

Infrastructure · Tema

Two grade-separated ramps and 34 piers built under live traffic, with night pours agreed with the Urban Roads department.

1.8 km

Size

26 months

Programme

Cantonments Office Park

Offices · Accra

Three linked pavilions with a shared basement, a solar canopy and a rainwater tank sized for the whole park.

12,100 m²

Size

24 months

Programme

Legon Science Block

Education · Accra

Teaching laboratories and lecture theatres built through two academic terms without closing the faculty.

6,800 m²

Size

18 months

Programme

Project transformation

Airport City: shell to hand-over in nine months.

The concrete frame of the block before fit-out

Before

The finished facade of the completed block

After

4,200 m²

Gross floor area

GHS 18M – 22M

Contract value

9 months

Programme

100%

Safety record

A concrete frame rising at sunset
847 +

Projects completed

32 +

Years of industry experience

98 %

On-time delivery rate

40 M

Bonding capacity, in cedis

Our record is the argument. From high-rise offices to motorway structures, we hand over buildings that are still doing their job a decade later — and we can show you the ones we finished before the date said so.

View case studies

Testimonials

Built right. Backed by our clients.

KM

Kwabena Mensah

Head of operations, Pelican Foods

They handed over our 4,200 m² cold store three weeks before the date in the contract, and the snag list was eleven items long. Nobody on our side has worked with a contractor like that before.

5.0

NA

Naa Adjeley Asare

Facilities director, Ridge Hospital Trust

Building next to a working out-patient department is a scheduling problem before it is a construction one. They planned around our clinics rather than asking us to plan around them.

5.0

YB

Yaw Boateng

Managing partner, Sankofa Estates

Three blocks, one programme, one set of valuations that always arrived on the Friday. The finish quality is the reason we have given them the next phase without going back out to tender.

5.0

A city construction site at dusk

Ready to build?

On-time, code-compliant construction starts here.

Priced estimate inside five working days · Licensed & insured · Ten-year structural warranty

Get an estimate See our pricing

5 working days

To a priced estimate

10 years

Structural warranty

4.9 / 5.0

168 Google reviews