Our projects
Buildings that are still doing their job.
Eight hundred and forty-seven completions since 1994. These five are the ones clients ask us about most, and the ones we are happiest to be judged on.
Start a projectCase studies
Five jobs, and what was hard about each.
Every one of these was built while somebody else was still using the site, the road or the building next door.
Ridge Medical Annex
Healthcare · Accra
A four-storey out-patient annex built alongside a working hospital, with the theatre wing handed over eleven weeks early.
9,400 m²
Size
22 months
Programme
Airport City Tower
Commercial · Accra
Fourteen floors of shell-and-core office over three basement levels, delivered with the tenant fit-out running two floors behind the frame.
18,600 m²
Size
30 months
Programme
Tema Motorway Interchange
Infrastructure · Tema
Two grade-separated ramps and 34 piers built under live traffic, with night pours agreed with the Urban Roads department.
1.8 km
Size
26 months
Programme
Cantonments Office Park
Offices · Accra
Three linked pavilions with a shared basement, a solar canopy and a rainwater tank sized for the whole park.
12,100 m²
Size
24 months
Programme
Legon Science Block
Education · Accra
Teaching laboratories and lecture theatres built through two academic terms without closing the faculty.
6,800 m²
Size
18 months
Programme
Ask for the full reference list
Project transformation
Airport City: shell to hand-over in nine months.
Before
After
4,200 m²
Gross floor area
GHS 18M – 22M
Contract value
9 months
Programme
100%
Safety record
Projects completed
Years of industry experience
On-time delivery rate
Bonding capacity, in cedis
Our record is the argument. From high-rise offices to motorway structures, we hand over buildings that are still doing their job a decade later — and we can show you the ones we finished before the date said so.
View case studiesTestimonials
Built right. Backed by our clients.
KM
Kwabena Mensah
Head of operations, Pelican Foods
They handed over our 4,200 m² cold store three weeks before the date in the contract, and the snag list was eleven items long. Nobody on our side has worked with a contractor like that before.
NA
Naa Adjeley Asare
Facilities director, Ridge Hospital Trust
Building next to a working out-patient department is a scheduling problem before it is a construction one. They planned around our clinics rather than asking us to plan around them.
YB
Yaw Boateng
Managing partner, Sankofa Estates
Three blocks, one programme, one set of valuations that always arrived on the Friday. The finish quality is the reason we have given them the next phase without going back out to tender.
Ready to build?
On-time, code-compliant construction starts here.
Priced estimate inside five working days · Licensed & insured · Ten-year structural warranty
5 working days
To a priced estimate
10 years
Structural warranty