Our clients

Most of our work comes from people we have already built for.

That is the only client testimonial that costs a contractor anything to earn, and it is the one we would ask about if we were you.

Ask for references

Testimonials

Built right. Backed by our clients.

KM

Kwabena Mensah

Head of operations, Pelican Foods

They handed over our 4,200 m² cold store three weeks before the date in the contract, and the snag list was eleven items long. Nobody on our side has worked with a contractor like that before.

5.0

NA

Naa Adjeley Asare

Facilities director, Ridge Hospital Trust

Building next to a working out-patient department is a scheduling problem before it is a construction one. They planned around our clinics rather than asking us to plan around them.

5.0

YB

Yaw Boateng

Managing partner, Sankofa Estates

Three blocks, one programme, one set of valuations that always arrived on the Friday. The finish quality is the reason we have given them the next phase without going back out to tender.

5.0

Who we build for

Six sectors, and the count in each.

A contractor who has never built your kind of building is learning on your money. These are the ones we have done enough of.

Healthcare

Out-patient blocks, diagnostic wings and theatre suites, built alongside departments that never closed.

9 completions

Since 1994

Commercial & offices

Shell-and-core towers, office parks and tenant fit-out, including the services co-ordination.

41 completions

Since 1994

Residential

Estates, apartment blocks and one-off houses across Greater Accra and the Eastern Region.

612 completions

Since 1994

Industrial & logistics

Warehousing, cold storage and light manufacturing, mostly in the Tema Heavy Industrial Area.

58 completions

Since 1994

Education

Teaching blocks, laboratories and halls of residence delivered around the academic calendar.

23 completions

Since 1994

Infrastructure

Interchanges, drainage and access roads built under live traffic with the Urban Roads department.

14 completions

Since 1994

Repeat work

The measure that actually matters.

Sixty-one per cent of our contract value in the last five years came from a client we had already built for.

Pelican Foods

Cold store, then the packing hall, then the office block above it.

3 contracts

Awarded

Sankofa Estates

Three residential phases in six years, each awarded without a further tender.

3 contracts

Awarded

Ridge Hospital Trust

The out-patient annex, then the diagnostic wing that joins onto it.

2 contracts

Awarded

Gulf Terminal & Bonded

A bonded warehouse, and the yard resurfacing that followed the first rains.

2 contracts

Awarded

Our projects

What we've built

A modern clinical block behind mature trees

Healthcare

Ridge Medical Annex

Accra · 9,400 m²

A commercial tower in the last stages of construction

Commercial

Airport City Tower

Accra · 18,600 m²

Concrete piers carrying a new road interchange

Infrastructure

Tema Motorway Interchange

Tema · 1.8 km

A glazed office building on a landscaped plot

Offices

Cantonments Office Park

Accra · 12,100 m²

A concrete teaching block with deep window reveals

Education

Legon Science Block

Accra · 6,800 m²

The finished entrance hall of a completed office building

Cantonments Office Park

Location

Accra

Size

12,100 m²

Duration

24 months

A city construction site at dusk

Ready to build?

On-time, code-compliant construction starts here.

Priced estimate inside five working days · Licensed & insured · Ten-year structural warranty

Get an estimate See our pricing

5 working days

To a priced estimate

10 years

Structural warranty

4.9 / 5.0

168 Google reviews