Our history

We have been finishing buildings since 1994.

Long enough that some of our first clients are now on their third project with us, and long enough that we still have the drawings for the first one.

Two site engineers in helmets going through a drawing

Our story

Thirty-two years of finishing things.

Mason started in 1994 as a six-man carpentry crew in Baatsona, taking the roofs nobody else wanted. The joinery shop is still there, and it is still the reason a late drawing change costs us days rather than a container from abroad.

We now run five site teams and a plant yard, and the work has grown from houses to hospitals — but the way it is priced, programmed and handed over has not changed since the first roof.

180 people

On the books

40 machines

Owned, not hired

Our history

Thirty-two years, seven firsts.

Nothing here happened quickly. Each one of these took two or three years of doing smaller work well enough to be asked.

1994

Six carpenters and a lorry

Kojo Mason takes on roofing work in Baatsona that the bigger firms are turning down. The joinery shop opens in a rented bay in Tema the following spring.

2001

The first block of flats

Twelve units in Dansoman, our first job with a structural engineer on it. It teaches us to programme the reinforcement before the formwork rather than after.

2008

D1 / K1 classification

Classification with the Ministry of Works & Housing opens public work. We buy our first two excavators the same year rather than hiring them again.

2013

First structural steel frame

A warehouse in the Tema Heavy Industrial Area, and the first job where our own welders are certified rather than subcontracted.

2017

ISO 9001, and a bond

Quality certification and a GHS 12M bonding facility arrive within four months of each other, which together change the size of job we can bid for.

2021

Kumasi yard opens

A second plant yard in Asokwa cuts mobilisation on Ashanti Region work from nine days to two.

2025

Contractor of the year

The Ghana Building Awards name us contractor of the year, in the same season we hand over the Ridge Medical Annex eleven weeks early.

A concrete frame rising at sunset
847 +

Projects completed

32 +

Years of industry experience

98 %

On-time delivery rate

40 M

Bonding capacity, in cedis

Our record is the argument. From high-rise offices to motorway structures, we hand over buildings that are still doing their job a decade later — and we can show you the ones we finished before the date said so.

View case studies

The people

The crews who actually build it.

Foremen, steel fixers, carpenters, masons and plant operators — most of them on the books rather than on a day rate.

A site crew in yellow helmets at a briefing

180

People on the books

1 : 9

Foreman to crew

0

Lost-time injuries, 2025

A city construction site at dusk

Ready to build?

On-time, code-compliant construction starts here.

Priced estimate inside five working days · Licensed & insured · Ten-year structural warranty

Get an estimate See our pricing

5 working days

To a priced estimate

10 years

Structural warranty

4.9 / 5.0

168 Google reviews